Folkpool 'Grandee' Case Study

Thursday 21 August 2008 by Dan Young

WALL CONSTRUCTION     GRANDEE WITH STEP INSTALLED  GRANDEE WITH 'MOSAIC TILE' LINER FITTED STEP GASKET AND FACE PLATE FITTED GRANDEE FILLED TO OPERATING LEVEL READY FOR A SWIM!

Comments (0)


Folkpool 'Emperor' timber pool wall construction pictures

Friday 29 February 2008 by Dan Young

Emperor Wall Installation Emperor step and wall insulation installed Decking installed, lights fitted, pool filling Emperor filled Emperor upper view Upper View 2 Folkpool Emperor completed Project

Comments (0)


Folkpool 'EMPEROR' Pool installation

Monday 18 February 2008 by Dan Young

The Brief for the project was to install a pool into a woodland setting. The area of land for the pool was fully overgrown so needed some clearing before we could start.

A pool of this type must be set into the ground at least 60cm. The pool site was marked out, excavated and spoil was landscaped into the downhill slope beyond the excavation.

A Block foundation was suitable for this installation. The blocks must be levelled front to back and side to side and then to each other so the wall will be level all the way round. A concrete base can be used instead and although more costly than the block method, it has its advantages.

50mm 'Jablite' polystyrene sheets are cut into the wall panels to provide extra insulation.

The Buttresses on this pool must be concreted in to provide the correct resistance against the water pressure from the inside of the pool. The Buttresses cover 3 sides of the pool in this instance, but this is not always the case.

The Fittings for the pool (lights, Skimmer, return and the Uni-step) must first be marked out on the wood using the templates provided. Once marked cutting the holes are straight forward using a jigsaw. When the holes are cut the fittings can be installed, again a simple procedure.

The track in which the liner bead will locate is now cut, drilled and fitted to the top of the wall.

We then proceed to levelling off the base within the pool walls and then laying a 50mm 'Jablite' floor on top. The floor will be insulated, soft under foot and will protect the liner from any sharp stones. It will also help to give a wrinkle free pool base.

We stick carpet tape to the wall before we install the insulation foam which will protects and insulates.

We are now ready to fit the liner. Sweep the pool base, lay the liner out (it does help if it is a warm day, as the vinyl will be more flexible). Make sure the corners of the liner match the corners on the pool, then push the liner bead into the tracking (some stretching and manipulation of the liner is usually required). The liner is made specifically for the pool so should be an exact fit.

Cutting the fittings into the liner requires that there be enough water in the pool to stretch the liner into the bottom corners of the pool. The Uni-step and lights are the lowest fittings so as soon as the water level is high enough, the fittings are attached by first locating the screw holes behind the liner then screwing through sandwiching the liner and gaskets together to create a water tight seal, then we simply cut the liner from within the face plates. Then fit the light bulb assembly within the light recess.

Continue to fill the pool until the water level reaches approx 1-2" below the return fitting, again the method is to screw the face plate and gasket through the liner then cut the liner out using the inside face plate as a guide. Plumb the filtration up at this point before continuing to fill the pool. Then fill to below the skimmer, fit the face plate and gasket, then cut the liner. Fill to operating level.

The Decking surround took approximately 2-3 weeks to complete.

The end result is a stunning 'Rustic' style Folkpool blending perfectly with the surroundings.

 

 

 

 

Comments (0)


Folkpool 'Jewel' Case Study (2005)

Monday 2 April 2007 by Dan Young

The existing decked area was dismantled to leave a chalk base.The Pool shell wasassembled (the wall in panels, simply bolted together in the corners)and then stood on the previously laid paving slabs (2 slabs under eachshort wall panel and 4 under each longer wall panel), bedded on toconcrete to acheive a perfect level. Some concreting along the longsides of the pool was required so water pressure would not bow thewall. Fittings were then cut into the wall, Underwater light, Skimmer,return and in this case a Swimjet unit was also fitted. The beautifullygrained Toprails were fitted at this point and the liner tracking. 

DSCF0634.JPGThePool base was levelled off using a fine granite chipping, 2 inchinsulation board cut and laid over that base and foam insulation fittedto the wall ready for the liner custom made to exactly fit the pool.While the water was filling the pool the plumbing for the filtrationand the Swimjet Pump was connected.

The electrician used a SwimelexControl panel to simplify the job of connecting Heater, Light and Pumpsto the main supply. The old decking Timber was then reused to completethe job. From start to finish - no more than 10 working days!

Folkpool Jewel.JPG


Free UK mainland delivery over £50


WORLD RENOWNED
POOL AND SPA
PRODUCTS FROM

Esther Williams Aluminium Pools

Garden Leisure

Folkpool Timber Pools

Spaform

Aqua Finesse


Doughboy


Elecro


SCP


paramount


Plastica

 Procopi 

 Aqua Warehouse

IPC Enclosures

Call the Customer helpline for a quote

Find us on Facebook

Follow us on Twitter

SSL Certificate